Date:
Monday, July 29, 2019 - 8:15am
System(s):
Gurobi 8.1.1 is installed on Owens.
module load gurobi/8.1.1
OSC will be conducting an emergency scratch purge on our scratch storage today, starting at 3:00 PM due to low data pool capacity.
Gurobi 8.1.1 is installed on Owens.
module load gurobi/8.1.1