Date:
Friday, February 28, 2020 - 11:15am
System(s):
Ansys 2020R1 is installed on Owens.
module load ansys/2020R1
A rolling reboot is scheduled to remediate a ptrace vulnerability and safely restore debugger functionalit
Ansys 2020R1 is installed on Owens.
module load ansys/2020R1